110 North Wacker
Bank of America Tower
Building
Completed
2020
Office
Concrete-Steel Composite
249 m / 817 ft
55
2
110
30
8 m/s
164,438 m² / 1,769,996 ft²
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Proposed
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The main contractor is the supervisory contractor of all construction work on a project, management of sub-contractors and vendors, etc. May be referred to as "Construction Manager," however, for consistency CTBUH uses the term "Main Contractor" exclusively.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
Material Supplier refers to organizations which supplied significant systems/materials for a building project (e.g. elevator suppliers, facade suppliers, etc).
2021 CVU Awards
11 October 2019
On the 50th anniversary of the Council on Tall Buildings and Urban Habitat’s founding, the CTBUH 10th World Congress returns to the Council’s home: Chicago....
Located along the South Branch of the Chicago River, 110 North Wacker was constructed upon a trapezoidal shaped site presenting design challenges in creating desirable lease spans while accommodating for a publicly accessible riverwalk of at least 9.1 meters (30 feet) in width, as required by city ordinance for any riverfront development site. These challenges were addressed by placing the building core within the center of the composite structure and taking the unusual approach of staggering the core walls to maintain a 13.7 meter (45 foot) span of leasable office space on each side of the building. This staggering of the core walls is then reflected in a series of rectilinear setbacks along the west façade, maintaining an orthogonal 1.5 meter (five foot) planning module throughout the building while providing for the equivalent of 14 corner offices per floor.
The building structure is composed of column-free floor spans framed with steel beams linking the central reinforced concrete core to a series of steel perimeter columns which transition into three trident shaped trusses on the riverfront creating an arcade for the riverwalk, which in conjunction with a small pocket park to the north, provides for 50 percent of the site being open-air public space at street level.