You must be a CVU Member to view this resource.
10 Holloway Circus
Beetham Tower
Building
Completed
2006
Residential / Hotel
All-Concrete
130 m / 427 ft
39
4
You must be a CVU Member to view this resource.
You must be a CVU Member to view this resource.
Construction Start
Completed
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
12 June 2013 | Birmingham
There are very few architects who have built tall buildings across numerous cities in the UK, and yet several cities outside London have enthusiastically embraced...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development