Filter by
Note: As this project is proposed, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by CVU.
You must be a CVU Member to view this resource.
1 Undershaft
The Shaft, No. 1 Undershaft; Trellis
Building
Proposed
Office
All-Steel
289.9 m / 951 ft
73
3
17
7 m/s
154,100 m² / 1,658,719 ft²
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
29 January 2018 | London
The London Committee of the CTBUH United Kingdom Chapter recently hosted [i]Geometry of Tall Buildings[/i], a conversation between leading architects and engineers on the geometry...
17 October 2016
Eric Parry, Nick Jackson & Tanya Parkin, Eric Parry Architects
The paper will describe the aims underpinning the proposed development at 1 Undershaft in the City of London. The project will be exemplary in putting...
29 January 2018 | London
The London Committee of the CTBUH United Kingdom Chapter recently hosted [i]Geometry of Tall Buildings[/i], a conversation between leading architects and engineers on the geometry...
17 October 2016 | London
Eric Parry of Eric Parry Architects is interviewed by Chris Bentley during the 2016 CTBUH China Conference. Eric discusses the design process of 1 Undershaft...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development