Note: As this project is proposed, the data is based on the most reliable information currently available. This data is thus subject to change until the building has completed and all information can be confirmed and ratified by CVU.
You must be a CVU Member to view this resource.
WoHo
Building
Proposed
Residential
Concrete-Timber Composite
98 m / 322 ft
29
18,000 m² / 193,750 ft²
You must be a CVU Member to view this resource.
Usually involved in the front end design, with a "typical" condition being that of a leadership role through either Schematic Design or Design Development, and then a monitoring role through the CD and CA phases.
The Design Engineer is usually involved in the front end design, typically taking the leadership role in the Schematic Design and Design Development, and then a monitoring role through the CD and CA phases.
Other Consultant refers to other organizations which provided significant consultation services for a building project (e.g. wind consultants, environmental consultants, fire and life safety consultants, etc).
11 February 2021
The high-rise mixed-use building that Berlin is planning to construct in the city’s Kreuzberg district is unusual for a few reasons.The 322-foot (98-meter) tower, whose...
Discover how vertical living is shaping the next generation of urban environments. Explore insights, research, and global leadership in vertical urban development